First we talked about the Circular project which was waiting
for the first soil batches from the harbour to be inspected and tested for
toxins to specify which one needed to be adsorbed from it so the soil would be
useable again. Valtter talked about Leeching and Emission spectrometer for such
studies.
After quick brief on Circular
project we moved to our project.
We agreed on the projects path that we would not take too
big of a slice from the cake to swallow and define the projects path on that
part (aggre cultural, soil treatment and possible 3D- Demo).
First laboratory tests for us will be measuring the pH
increasing capabilities and phosphor adsorption. Even thought the last years
student group did these studeis but Renotech requires the confirming test
results from these test for this years batch too.
Physical capabilities will allso be tested on our part too
unincluding temperature tests as those have already been done.
Toxin nullifying tests will include treating sulfuric acid
contaminated soils as the possibility to treat it’s pH to neatral level again
and make it farmable ground again.
For next time we agreed on seeing if the 3D- demo will be
implented in our project too, when we are going to have the facilities tour in
Raisio and our part was to get to know the research applications.
No comments:
Post a Comment